Monday, May 29, 2000

Building the Elk Grove House Pic #10

To my disappointment, the outside of the house has not changed much in the last two weeks. On the inside a lot has changed in the last week, the walls have been painted, the moldings, windowsills and railings installed and painted, and the cabinets have all been installed. It is hard to believe that the house is supposed to be completed in 24 days!

No comments:

Post a Comment